🇭🇷 CROATIAN BRIDGE FAILS... THEN NAILED IT Two teams built a bridge from opposite cliffs and totally missed each other in the middle. The ends didn’t match in height, position, or direction like a real-life group project gone wrong. Turns out steel bends, temps shift, and small math fails stack up over 10 years. But because it was steel not concrete, engineers jacked, cut, and welded it into place with laser-like precision. Source: StarBuzz-r1q
804,84K